NEW

P&K TAL2K

Multi-Core

Calculation will run with almost 2-fold (Dual Core) or 4-fold (Quad-Core) the speed.

Cluster

Calculation will run up to 16-fold the speed. (Requires multiple networked sufficient PCs; Special Installation knowledge required.)

EnCoCo

P&K TAL2K



How to declare components as time-dependent

Some components of the sources can be defined as time-dependent. As precondition a timeline must be loaded, otherwise these menu options remain inactive. Above the table cell of interest, time-dependent can be selected with the right mouse button. The cell value is represented now as NAN (NOT A NUMBER) and in inputs/ Edit Timeline the appropriate column is available. If NAN is replaced by a number, the column will be deleted after a warning.

A time-dependent component can be filled easily via Alter Column Values.


Google
  Web www.EnCoCo.com